Catwalk, complete!

By , August 26, 2016 7:30 am

Yeah, work that catwalk, Data!

And cross that off the list!

160824lastthingonthelist

After three weeks, we’ve completed all of the major attic/ceiling work. Yay!

On Monday, Steven installed new lights and power (each light base has one power receptacle). It was important he do this first, because the drywall ceilings went up Monday, and we no longer had daylight in the attic!

160823newatticlights

On Wednesday, we finished the north side of the cat walk (see south side construction here). We already had the side boards up there, and just needed to cut out notches for them to fit around the conduit,

160824conduitmarking

I laid the boards down next to the platform, and marked the holes that needed to be cut to fit around the conduit

160824cuttingconduitholes

then Steven cut them

screw them in,

160824screwingsideboardsin

then cut some shorter pieces to fit at the end, and over some ductwork. I also vacuumed up all the sawdust we created. Might as well have it clean before the insulation goes in, right?

160824shopvac

All finished!

160824finishedcatwalk

And spent!

160824poopedoncatwalk

It’s so warm up there. I think we should do our next attic project in the winter. Ha.

160824stevendataandcatwalk2

It feels good to be done with the majority of the really hard stuff! We still have a few things to do:

  • pick out and install lighting trim kits and vent covers
  • buy paint
  • buy a new mattress and schedule delivery (we need a new one and why haul the old one back upstairs?)
  • seal some holes in the basement (related to the new joist project)
  • clean upstairs, move back in!
  • clean downstairs

And our contractor has been working all week:

160823baffle 160822newceilingmaster

  • Tuesday – installed subfloor over dining room, patched all drywall on walls, mudded and taped ceilings

160823diningroomsubfloor 160823masterbedroom 160823patchedmasterbedroom

Remember this spot?

  • Wednesday – more mudding
  • Thursday – sanding
  • Friday – sanding and attic insulation install

The contractors should be done today! Then we have someone painting all next week, then we can move back upstairs next weekend. YAY!

10 Responses to “Catwalk, complete!”

  1. Karen says:

    Awwwww Data 🙂
    I want to move in with you!

  2. Anne says:

    I’m so glad the end is almost in sight!!!

  3. Chaitali says:

    So impressive! I can’t wait to see photos of the finished product.

    • kilax says:

      Me too! I hope the paint colors we picked turn out okay. And that the trim doesn’t look horrible (after all it has been through).

  4. ChezJulie says:

    Love Data on the catwalk. Heh.

  5. Amy says:

    Woo-hoo! Almost done!

  6. Mica says:

    LOL, I’m so amused that you captured a cat on the actual catwalk. That photo of Data and Steven is really adorable! (And also, I’m impressed but not terribly surprised that Steven does attic work in a collared shirt and a belt.)

    • kilax says:

      Hee hee. Everyone keeps saying I should have added “catwalk” music to the video, too, but I don’t know how to do that 😉

      Ha! Lots of people have said that to me about his attire! 🙂

Panorama Theme by Themocracy

33 ‘queries’.