Random house updates time!

There’s a few things we worked on in June that I haven’t documented yet. I actually keep a running spreadsheet of the dates and projects we work on, but I like to post it here too, for narrative/photo documentation.

Project 1 – pulling ethernet cable

To get internet at our house, we have a wireless antenna mounted outside on the side of the house (cable is not available where we live). We wanted to pull ethernet cable from the antenna (which is by the attic) to our first floor office (where our network switch is), so Steven had the brilliant idea of running the cable through the old central vacuum tubing that runs in the house! The tubing already ran from the second floor to the basement, so Steven bought more tubing to run it in to the attic (to connect to the antenna). This required some demolition in our second floor hallway!

160530ethernetproject1 160530ethernetproject2 160530ethernetproject3

The new vacuum tube installed.

160530ethernetproject4

Patching up the hole.

160530ethernetproject5

Steven putting the tubing in in the attic

We put the new tubing in on May 30, pulled the cables through on June 5, and worked on patching throughout June and finished the wall (painting) on July 4.

160713allpatchedup

All patched up!

Project 2 – fixing the garage attic gas leak

Ha, we put this one off for awhile. We noticed a natural gas smell in our downstairs bathroom when the FHA 203k streamlined contractors finished up their work in the end of April. It turns out that bathroom exhaust ductwork that runs through the attic was punctured, and the existing gas leak (caused by a damaged/tapered pipe connection) was going in to that ductwork, hence why we were smelling it in the bathroom.

160611gasleakwork2

The tapered/messed-up pipe.

So the project entailed replacing gas pipes and the bathroom ductwork. We made sure to do it on a really hot day (June 11) since it involved being in the attic. Ha ha! It took all day, and a bit of brainstorming, but we fixed it, and we can’t smell the gas anymore. Yay!

160611gasleakwork1

The small space Steven worked in. I was the gopher!

It also gave us a chance to try out rigid ductwork, which we are thinking of using in our other attic!

Project 3 – jacking up the house

This is an ongoing project. Two joists in our basement are being crushed because of faulty loading (due to faulty design!) coming from the upper floors. Because these joists are crushed, the floors on top of them are not level. Our fridge actually leans back toward the wall that is above these joists, and my office shelves lean toward the wall on the other side.

Well, they used to! It’s getting better, because we put jacks in the basement to jack those joists up. We’re using the tall jack to push one up from the floor, and a short jack to push one up from the brick wall it sits on.  Steven put in supportive blocking to try to keep the joists from failing by buckling to the side.

160618jacks1 160618jacks2

You know what would be awesome? If I remembered ANYTHING I learned about loading in college. Gah. Most useless architecture degree EVER.

We started jacking the house up on June 18. We do a little every few days. It’s VERY interesting to see how the house responds. Walls are obviously cracking. The basement door, which is very close to the joists, gets harder and harder to close (and has actually been open since Saturday, since we can’t close it) the more we jack up the joists, because the floor level is rising.

But! It’s not all bad! The first level floors are leveling out, and second level doors that weren’t plumb before are squaring off and closing like they should. Yay!

Eventually, when things are level and we’ve allowed them to settle, we’ll add solid blocking to support the load and replace or sister the affected joists with new engineered lumber joists. Then, we can go through the process of fixing all the cracks and unevenness caused by the buckling in the floors. And eventually, get a backsplash in the kitchen – that is on hold since the wall it would go on is one of the walls being affected by the jacks!

Hopefully I’ve said this on the blog before, but I am very impressed by how much of a go-getter Steven is with figuring out house projects and tackling them. He loves to do research and figure things out, and he’s totally in his element! It doesn’t come as naturally to me, but I like helping him, and that we’re working on things together.

13 Responses to “House Updates!”

  1. Kiersten says:

    I’m so impressed! These are major projects and you guys are doing such a good job! And it is good to do them right away because you totally lose motivation the longer you live somewhere (as evidenced by our ethernet cable that runs across our living room- and drives me nuts, but I’ve yet to fix it in 5 years).

    • kilax says:

      Aww, thanks! And I am happy we are tackling some things right away… cause there is so much to do!

      LOL, where do you need to put the cable – through the ceiling? Or up the wall?

  2. Wow…that is a ton of work. You guys are obvs very practical and not afraid to give things a go!!

  3. Alice says:

    OK, just imagine this entire comment is just a series of pictures of me with my jaw hanging wide open, catching flies. You guys are IMPRESSIVE.

  4. Shelley B says:

    Wow, these are some pretty intense projects! You guys are really doing well with figuring this stuff out (says the one who needs to have a rectangular patch done in her drywall, thanks to a plumbing leak and fix).

  5. Amy says:

    Yeah, I am in awe, too, of you both! Best homeowners ever!

  6. Kim says:

    Wow!! You guys are tackling really big projects. I’m impressed. Tell Stephen he’s awesome!!

  7. It makes me so nervous to read all these projects! I’m not a handy person at all (although my boyfriend is), so I’m not sure I’d do them myself. Nice work!

Panorama Theme by Themocracy

33 ‘queries’.